Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

ECA EIA-364-93

ECA EA-364-93 1997-JUL-01 TP-93 REPEATED WRE CONNECTON AND DSCONNECTON TEST PROCEDURE FOR NSULATON DSPLACEMENT CONTACTS DC FOR ELECTRCAL CONNECTORS

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$33.00 tax incl.

$66.00 tax incl.

(price reduced by 50 %)

1000 items in stock

Object

The object of this test procedure is to assess the ability of a reusable insulation displacement termination to withstand a specified number of connections and disconnections.

Customers who purchased ECA EIA-364-93
also purchased
  • ECA EIA-364-85 : TP-85 GENERAL TEST PROCEDURE FOR ASSESSING WEAR AND MECHANICAL DAMAGE TESTING OF CONTACT FINISHES FOR ELECTRICAL CONNECTORS
  • ANSI A10.18 : Construction and Demolition Operations - Temporary Floor and Wall Openings, Flat Roofs, Stairs, Railings, and Toeboards - Safety Requirements-This is Now Copyrighted by ASSE/SAFE
  • ECA EIA-364-79 : TP-79 INSERT BOND STRENGTH TEST PROCEDURE FOR ELECTRICAL CONNECTORS
  • ECA EIA-364-87A : TP-87A NANOSECOND EVENT DETECTION TEST PROCEDURE FOR ELECTRICAL CONNECTORS, CONTACTS AND SOCKETS
See More Documents

Contact us