Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

ANS 2.10

ANS 210 2003-APR-14 Crtera for the Handlng and ntal Evaluaton of Records from Nuclear Power Plant Sesmc nstrumentaton

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$29.50 tax incl.

$59.00 tax incl.

(price reduced by 50 %)

1000 items in stock

This standard provides criteria for the timely retrieval and the subsequent processing, handling, and storage of data obtained from seismic instrumentation specified in ANSI/ANS-2.2- 2002[1].1) Also included are initial evaluation criteria to determine whether earthquake motion at the site has exceeded the plant's operatingbasis earthquake ground motion (OBE).

This standard does not address procedures for plant walkdowns immediately (within 8 hours) after an earthquake, for ensuring a safe and orderly shutdown, for long-term evaluations of the building and equipment response data, and for subsequently returning the plant to operation. These topics are addressed in ANSI/ANS- 2.23-2002 [2].

1) Numbers in brackets refer to corresponding numbers in Section 6, "References."

Customers who purchased ANS 2.10
also purchased
  • ANS 2.2 : Earthquake Instrumentation Criteria for Nuclear Power Plants
  • ANS 2.3 : Estimating Tornado, Hurricane, and Extreme Straight Line Wind Characteristics at Nuclear Facility Sites
  • ANS 2.26 : categorization of nuclear facility structures, systems, and components for seismic design
See More Documents

Contact us