Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

ANS 3.5

ANS 35 2009-JAN-01 Nuclear Power Plant Smulators for Use n Operator Tranng and Examnaton

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$74.50 tax incl.

$149.00 tax incl.

(price reduced by 50 %)

1000 items in stock

This standard establishes the functional requirements for full-scope nuclear power plant control room simulators for use in operator training and examination.1) The standard also establishes criteria for the scope of simulation, performance, and functional capabilities of simulators. This standard does not address simulators for test, mobile, and research reactors, or for reactors not subject to U.S. Nuclear Regulatory Commission (NRC) licensing.

This standard does not establish criteria for the use of simulators in training programs.

1) Guidance is provided in Appendix D to adapt this standard to part-task and limited-scope simulators to ensure fidelity appropriate to the intended use for operator training and examination.

Customers who purchased ANS 3.5
also purchased
  • ISEA Z358.1 : American National Standard for EMERGENCY EYEWASH AND SHOWER EQUIPMENT
  • API STD 610 : Centrifugal Pumps for Petroleum, Petrochemical and Natural Gas Industries-Eleventh Edition; Incorporates Errata: July 2011; ISO 13709:2009 Adoption
  • ASME B16.5 : Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch Standard
  • ASME B31.1 : Power Piping-Includes Interpretations No. 2 through 6, 8 through 10, 13, 15, 17 through 25, 27 through 31, and 42 through 46
See More Documents

Contact us