Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

TIA TIA-102.CAEA

TA TA-102CAEA 2009-APR-01 Project 25 Conformance Profle Level One - Basc Conventonal Operaton

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$70.50 tax incl.

$141.00 tax incl.

(price reduced by 50 %)

1000 items in stock

This document is intended to clarify key aspects of the operation of Project 25 subscriber, base, and repeater station equipment in the interests of conformance.

It includes a set of PCP items or procedures for basic conventional operation as follows:

PCP 1.1 – Voice Calls

• PCP 1.1.1 – Group Call via Repeater Operation

• PCP 1.1.2 – Individual Call via Repeater Operation

• PCP 1.1.3 – Group Call Direct Operation

• PCP 1.1.4 – Individual Call Direct Operation

It is consistent with other pertinent APCO Project 25 Conformance Profiles, namely:

Project 25 Conformance Profile – Level 2 (Advanced Conventional Operation)

Project 25 Conformance Profile – Level 3 (Basic Trunking Operation)

Project 25 Conformance Profile – Level 4 (Advanced Trunking Operation)

Project 25 Conformance Profile – Level 5 (Phase II Trunking Operation)

This document is primarily aimed at manufacturers and conformance test facilities to serve as a standard reference of conformant air interface signaling, as a means of assisting manufacturers in the development of conformant Project 25 equipment. It also defines a framework against which manufacturers may describe the conformant behavior of their Project 25 products.

It is not designed as a functional interoperability test suite for end users, for which readers are referred to [7].

This document assumes an audience familiar with terms and definitions contained in the APCO P25 standards.

Customers who purchased TIA TIA-102.CAEA
also purchased
  • TIA TSB-102.CBBA : Project 25 Recommended Compliance Assessment Tests – Transceiver Performance – C onventional Mode Subscriber
  • TIA TSB-102.CBBF : Project 25 Recommended Compliance Assessment Tests – Transceiver Performance – Trunking Mode Subscriber
  • TIA TSB-102.CBBJ-B : Project 25 Recommended Compliance Assessment Tests - Trunking Interoperability For U.S. Network Protection
  • TIA TIA-102.AABC-C-1 : Project 25 Trunking Control Channel Messages Addendum 1-Addendum to TIA-102.AABC-C
See More Documents

Contact us