Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

SAE AMS2375D

SAE AMS2375D 2007-JUN-01 Control of Forgngs Requrng Frst Artcle Approval

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$36.50 tax incl.

$73.00 tax incl.

(price reduced by 50 %)

1000 items in stock

Purpose

This specification covers procedures for obtaining first-article (preproduction) approval of forgings and the controls to be exercised in producing subsequent production forgings.

Application

This procedure has been used typically for forgings which require preproduction approval and where assurance is required that production lots are of essentially the same metallurgical quality and are produced by the same basic procedures as the forging originally qualified.

Contact us